Project-based companies
Project and site tracking for contractors
Track site queries, changes in scope and handover documents with the project team.
- Location and requested change B2 · Wet volume · Revision request
- Technical review and approval Technical review finished · Waiting for approval
- Revised drawing and site confirmation Revision D · Field confirmation
How does a site change reach the office?
The construction site team reports the difference between the drawing and the site. The technical office examines the affected production. After the customer or project officer makes the decision, the site updates the work schedule and tasks.
Where is work failing?
- Inability to see whose queue the field request is in the technical office.
- Work begins before the scope approval from the customer is filed.
- Works with deadlines falling apart in one revision.
Sample workflow
Wet volume plan changes in the field
The application detail of a section changes due to the existing plumbing line. Field engineer adds photo and drawing reference. The technical office examines the alternatives, records the customer decision and forwards the new revision to the field team.
-
Open changelog
Write down the floor, location, drawing number and manufacturing structured areas that may be affected.
- sample record
- B2 · Wet volume · Revision request
-
Link approval to work schedule
When the technical review is completed, open the approval step to the authorized person. If date or scope changes, commit to affected tasks.
- sample record
- Technical review finished · Waiting for approval
-
Update delivery list
Link the updated drawing, field control, and closing evidence to the project file.
- sample record
- Revision D · Field confirmation
How to solve it with XtraCRM?
- Project and Gantt
- Monitor construction site works, responsible persons, delivery dates and project files together.
- Business process automation
- Design a flow that opens an approval task to the officer once the internal review is completed.
- document management
- Keep version and approval history of internal instructions. Attach the document of external drawing approval to the project file.
Frequently asked questions
How to open a request for information and RFI record at the construction site?
Record the location, drawing number, field question, and date required for response. Assign the question to the technical office.
When setting up the first record, separate the fields that describe the job and the fields needed to make the decision. The customer or request reference, who the record owner is, and the next return date should have the same meaning to the team. If any information is missing, leave it blank and assign the task to the person who will complete it. When the person taking the recording changes, it is necessary to be able to read the previous conversation, the commitment given to the customer and the open question in one place. Open records with no defined responsible person or date can be handled separately in the weekly control. Include the custom field only for information that will actually be used.
Follow this step in the sample workflow. Write down the floor, location, drawing number and manufacturing structured areas that may be affected.
How to approve a change request in the construction project?
Write the technical impact, scope and date that will be reflected in the program. Match the competent person's decision to the relevant task and drawing.
When a change arrives, keep the initial description of the request, the new information, and the work it affects in the same place. Let the reviewer determine which document or task will change. If it is necessary to add an approval condition to the phase transition, appoint an in-house responsible person with BPA. If the customer decides, record the date and relevant version. If confirmation is not yet available, clearly write the information expected for the next action. When the decision is made, the relevant task, follow-up date and accessed file version should also be updated. Where a decision is reversed, leave the reason on record.
Follow this step in the sample workflow. When the technical review is completed, open the approval step to the authorized person. If date or scope changes, commit to affected tasks.
How to communicate the current drawing revision to the field?
Report the published version and effective date. Record the field supervisor's confirmation for the affected manufacturing.
When delegating work, specify what decision the new responsible person will make or what output he will produce. Show the last approved document, the changed conditions and the date given to the customer in the same task. The opposing team does not have to open the first record again, but can access the previous notes through the associated record. Check authority and access limits before assigning tasks. You can design a separate notification or approval step for the relevant team when the condition is met. In order to understand that the transfer is completed, the acceptance status and the next step should be recorded.
Follow this step in the sample workflow. Link the updated drawing, field control, and closing evidence to the project file. Before making the decision, record the changed information and communicate the updated date to the team member who will undertake the next step.
How to make delay visible in construction site work schedule?
Compare the changed task date with the delivery due to it. Separate the work awaiting decision in the program.
Separate the target date of the job, the time the customer will be notified, and the actual date of the completed transaction. If an appointment or task changes, check the jobs that will start after that. If confirmation from another team is required, set a delivery date for that confirmation as well. Show the relevant record and the person responsible next to the calendar. Thus, the person reading the calendar at the meeting does not have to search for correspondence regarding the status of the work. Direct the reminder before the completion date to the person who can take action. In the weekly plan, start with the commitments made to the customer first.
Follow this step in the sample workflow. When the technical review is completed, open the approval step to the authorized person. If date or scope changes, commit to affected tasks.
How to prepare a construction delivery checklist?
Divide the deliverable, documentation and field confirmation into separate items. Assign responsibility for each item.
Let each item on the checklist produce a verifiable result. Before a box that says "done", include information about who checked it, when and from which source. If a document or photo is required, associate it with the correct file space. If there is a deficiency, instead of advancing the closing date, open a correction task and assign a person to re-check. The result reported to the customer and the internal approval record should be seen in the same job. Have the team decide from the beginning the evidence required to consider a job closed, and indicate any obvious exceptions in the report.
Follow this step in the sample workflow. Link the updated drawing, field control, and closing evidence to the project file. Before making the decision, record the changed information and communicate the updated date to the team member who will undertake the next step.
At what stages are field demands monitored in a contracting company?
Separate decisions such as new, under review, awaiting approval, delivered to the field, and closed.
The name of the Kanban stage should clearly describe the completed or expected work. Set a condition for each transition. Conditions such as the next team being ready to take on the job, the document being completed, or confirmation from the customer indicating why the record remains in that column. Keep the responsible and date fields separate from the phase. In Smart Process, you can choose the fields and stages appropriate to your industry and use BPA for approval or notification. Work with a single stream first. For jobs that ended differently, record the reason for closing and review the outstanding ones at the weekly team meeting.
Follow this step in the sample workflow. Write down the floor, location, drawing number and manufacturing structured areas that may be affected. Before making the decision, record the changed information and communicate the updated date to the team member who will undertake the next step.
How to track the additional cost of a scope change?
Record the impact in the proposal or relevant financial document. Verify the amount and schedule decision with the contract administrator.
The total agreed upon in the sales quotation and the open balance to be collected are different business records. Match the order scope, approved amount, payment date, and actual transaction to the relevant customer or supplier. Let the authorized person confirm the amount whose due date has changed. Record the document and the person responsible for an expense that is discovered later. In weekly control, distinguish which amount has been collected and which is awaiting approval or maturity. Thus, when the operation is completed, the unfinished business of finance remains visible. If formal action is required, associate the result with the relevant action reference.
Follow this step in the sample workflow. When the technical review is completed, open the approval step to the authorized person. If date or scope changes, commit to affected tasks.
What open jobs should be included in the construction site weekly report?
Field questions with delayed responses, changes awaiting approval, and missing closing documents should appear separately.
Tailor the report to the decisions the team will make that week. Separate tasks with single-meaning situations such as completed, pending, and overdue. It should be clear which responsible person will act on which date. Instead of just looking at the number of registrations at the meeting, examine the reason for the delayed work and the customer it affects. Open a separate remediation task for recurring issues. Teams should fill out the date and status fields in the same way to understand the same period. When interpreting the results, do not confuse opened work, completed delivery and confirmation pending records.
Follow this step in the sample workflow. Link the updated drawing, field control, and closing evidence to the project file. Before making the decision, record the changed information and communicate the updated date to the team member who will undertake the next step.
How is the acceptance of material arriving at the construction site monitored?
Check the quantity received for the relevant job and order. Designate a delivery person for missing quantity or wrong material.
Planning the amount, recording the physical movement, and explaining the difference are different steps. Save the relevant warehouse, unit of measure, and document reference. If a promise will be made to the customer based on the balance shown before the transaction is made, confirm with the warehouse manager. In case of partial entry or exit, process the actual work first and determine the date and responsible person for the remaining work. Write the reason for a record with a count difference and the person who made the decision. This way, in the next meeting, the team can check where the amount comes from. Check that the sales, purchasing and warehouse team are using the same unit.
Follow this step in the sample workflow. When the technical review is completed, open the approval step to the authorized person. If date or scope changes, commit to affected tasks.
How to move construction project tracking from Excel?
Start by verifying open site requests, valid drawing numbers, and ongoing tasks at the pilot site.
Validating the migration in a pilot limited to a team, customer group, or business type helps weed out unnecessary areas of the business. First identify active records and their unique references, fix duplicates. Then define default stages and user accesses. Have the people who open the ticket, get the job, and close the job complete the same pilot from start to finish. Simplify the form accordingly if any information comes too late. Once the migration is complete, open jobs, owners and dates should be individually comparable to the old list. Separate archive documents according to the business team's access needs.
Follow this step in the sample workflow. Write down the floor, location, drawing number and manufacturing structured areas that may be affected.
Your company’s size does not limit your access to XtraCRM features.
All system features are included in every plan.
And all the features still to come...
* Excludes the free plan.Starter
All modules included
- 5 users
- 10 GB storage
Growth
FOR GROWING TEAMSAll modules included
- 15 users
- 25 GB storage
Prefer to use your own server? · Talk to our team
Let's take the first step together
Let's talk about the bottleneck in your business.
Let's show the solution in the product.
Get advice from our experts. Let's talk about how XtraCRM can be used in your business, suitable packages and initial steps.
- Evaluation according to your business processes
- Support on package and module selection
- Your installation and data migration questions
Prefer to write directly?
[email protected]